<code id="ng627"></code>

  • <code id="ng627"></code>
  • <tr id="ng627"></tr>

    <tr id="ng627"></tr>

      1. <output id="ng627"><track id="ng627"></track></output>
        product thumbnail

        項目案例
        (Reference)

        “Further Evolved “Ubiquity on the Road” With faster, more accurate information, LSIS’ high-tech freeway traffic management system facilitates safe driving and efficient communication on the freeway.

        • Main Line
        • Metro Line
        • 下載
        • 客戶支持

        Main Line

        Kyungbu High Speed Railway

        • - HSR Signalling System
            Consortium Leader[Phase 2 of Kyungbu HSR Project
            Automatic Train Control System[ATC, Onbroad & Wayside Systems]
            Train Traffic Management System[TMS]
            System Engineering
            Safety Facilities
        • - HSR Phase 2 CTC Implementation
             Localized and Implemented CTC for HSR Phase 2
             Primary Backup Railway traffic Control Centers
        • - HSR Electrical System

        Reference-s1.jpg

        Metro Line

        Seoul Metro Phase 1 Line 3 & 4

        • - CTC, Control Facility
        • - Electrical Power System Facility:
            7 DC Substation (Line 3)
            5 DC Substation (Line 4)

        Reference-s2.jpg

        Seoul Metro Phase 2 Line 6

        • - CTC, Control Facility
        • - Signalling
        • - Electrical Power System Facility: 12 DC Substation

        Reference-s3.jpg

        Line 7 & 8

        • - CTC, Control Facility
        • - Electrical Power System Facility: 11 DC Substation

        Reference-s4.jpg

        Busan Line 1 & 2

        • - Signalling, TTC, ATC, Simulation System

        Reference-s5.jpg

        Incheon Line 1

        • - Electrical Power System Facility: 10 DC Substation

        Reference-s6.jpg

        Daegu Line 1 & 2

        • - Electrical Power System Facility: 10 DC Substation (Line 1) 9 + 1 DC Substation (Line 2, Extension)

        Reference-s7.jpg

        LRT

        Incheon International Airport Shuttle Train

        E&M Work

        • - Supply / Installation and Operation / Maintenance of IAT (Intra Airport Transit
        • - System as a Consortium Leader
        • - Managed Consortium Project Control, System Integration, Operation and Maintenance Between 03.11~Now
        • - LSIS Delivered and Performed
            Electrical Power System(AC SWGR, DC SWGR, Rectifier, SCADA, Etc.)
            Communication System
            Platform Screen Doors
            1st Unmanned LRT in Korea

        Incheon Line 2

        E&M Consortium

        • - 12 Substations
        • - 6 Energy Storages
        • - SCADA
        • - Electric Work
        • - 27 stations. PSD

        Gwangmyoung

        E&M Works

        • - LSIS will fabricate, purchase and deliver all mechanical, electrical and automation systems
        • - Except for civil / architectural works
        • - R/S, electrical power facilities, signalling, communication system, PSD and catenary system, etc.
        • - Sub-system engineering services to implement independent systems & Integration
        • - Providing total engineering services for train operation system.

        Overseas

        Thailand ST1 & ST4

        • - ST1 Signaling & Communication System
             CTC : 52 Station
             CIC: 14 Station
             Block System: 14 Sets
             Level crossing: 32 Sets
             Switch: 127 Sets
             Track Circuit: 150 Sets
             Signaling Device: 342 Sets
        • - ST4 Signaling & Communication System
             CTC : 7 Station
             CBI: 7 Station ( LS-EIS520V)
             Block System: 7 Sets
             Communication System: 7 Sets
             Switch: 92 Sets
             Track Circuit: 357 Sets
             Signaling Device: 131 Sets
             Power Supply: 7 Sets

        Reference-s8.jpg

        Main Line

        Kyungbu High Speed Railway

        • - HSR Signalling System
            Consortium Leader[Phase 2 of Kyungbu HSR Project
            Automatic Train Control System[ATC, Onbroad & Wayside Systems]
            Train Traffic Management System[TMS]
            System Engineering
            Safety Facilities
        • - HSR Phase 2 CTC Implementation
             Localized and Implemented CTC for HSR Phase 2
             Primary Backup Railway traffic Control Centers
        • - HSR Electrical System

        Reference-s1.jpg

        Metro Line

        Seoul Metro Phase 1 Line 3 & 4

        • - CTC, Control Facility
        • - Electrical Power System Facility:
            7 DC Substation (Line 3)
            5 DC Substation (Line 4)

        Reference-s2.jpg

        Seoul Metro Phase 2 Line 6

        • - CTC, Control Facility
        • - Signalling
        • - Electrical Power System Facility: 12 DC Substation

        Reference-s3.jpg

        Line 7 & 8

        • - CTC, Control Facility
        • - Electrical Power System Facility: 11 DC Substation

        Reference-s4.jpg

        Busan Line 1 & 2

        • - Signalling, TTC, ATC, Simulation System

        Reference-s5.jpg

        Incheon Line 1

        • - Electrical Power System Facility: 10 DC Substation

        Reference-s6.jpg

        Daegu Line 1 & 2

        • - Electrical Power System Facility: 10 DC Substation (Line 1) 9 + 1 DC Substation (Line 2, Extension)

        Reference-s7.jpg

        LRT

        Incheon International Airport Shuttle Train

        E&M Work

        • - Supply / Installation and Operation / Maintenance of IAT (Intra Airport Transit
        • - System as a Consortium Leader
        • - Managed Consortium Project Control, System Integration, Operation and Maintenance Between 03.11~Now
        • - LSIS Delivered and Performed
            Electrical Power System(AC SWGR, DC SWGR, Rectifier, SCADA, Etc.)
            Communication System
            Platform Screen Doors
            1st Unmanned LRT in Korea

        Incheon Line 2

        E&M Consortium

        • - 12 Substations
        • - 6 Energy Storages
        • - SCADA
        • - Electric Work
        • - 27 stations. PSD

        Gwangmyoung

        E&M Works

        • - LSIS will fabricate, purchase and deliver all mechanical, electrical and automation systems
        • - Except for civil / architectural works
        • - R/S, electrical power facilities, signalling, communication system, PSD and catenary system, etc.
        • - Sub-system engineering services to implement independent systems & Integration
        • - Providing total engineering services for train operation system.

        Overseas

        Thailand ST1 & ST4

        • - ST1 Signaling & Communication System
             CTC : 52 Station
             CIC: 14 Station
             Block System: 14 Sets
             Level crossing: 32 Sets
             Switch: 127 Sets
             Track Circuit: 150 Sets
             Signaling Device: 342 Sets
        • - ST4 Signaling & Communication System
             CTC : 7 Station
             CBI: 7 Station ( LS-EIS520V)
             Block System: 7 Sets
             Communication System: 7 Sets
             Switch: 92 Sets
             Track Circuit: 357 Sets
             Signaling Device: 131 Sets
             Power Supply: 7 Sets

        Reference-s8.jpg

        下載

        主題 分類 語言 修改日期

        客戶支持

        常見問題 more
        聯系我們 more
        top